The building has 2 underground levels where there are 46 parking spaces. In addition to the parking spaces, basements 1 and 2 also house storage rooms, technical rooms, etc.
The lower ground level consists of a central hall, kitchen, staff restaurant, and several offices.
The upper ground level includes the main entrance for clients, employee entrance, large central hall, large multifunctional space, several offices, and multiple toilets.
The upper floors are administrative spaces, which contain several large offices, and each floor has male and female toilets. The building has 2 staircases and 2 elevator shafts. The level of completion is about 80-85%.
The following works remain to be done on the building:
– Final layer in the basement garage
– Elevator installation
– Execution of floor laying works throughout the building
– Installation of suspended ceilings with office lighting
– Installation of interior joinery, sanitary ware, electrical fittings, fan coils
– Roof repair, facades, exterior joinery
– Repair of all technical systems and installations
- Garage:
46Compare listings
Compare